Previous incidents
Wofbit Networks is now live on LINX Mombasa with active BGP sessions and pref...
Resolved Feb 21, 2026 at 9:44pm UTC
Port up with stable L2 adjacency. BGP sessions to LINX route servers and bilateral peers established. IPv4/IPv6 routes exchanging with production traffic flowing via the fabric.
Traffic engineering in progress for controlled rebalancing.
No Service impact; monitoring ongoing.
AMS1 is currently offline due to scheduled maintenance.
Resolved Feb 14, 2026 at 2:34pm UTC
All infrastructure upgrades were executed successfully, with validation checks confirming normal operational performance across the platform.
Production traffic has been progressively re-balanced in line with the intended routing policy, and network behavior remains stable.
No customer impact was recorded during the maintenance window.
We will continue to monitor performance as part of standard post-change assurance to ensure sustained service integrity and capacity objectives are met.
1 previous update
Connectivity to LINX LON1 and LINX LON2 is now operational, strengthening int...
Resolved Feb 13, 2026 at 9:47pm UTC
Both fabrics are:
• Physically connected and stable
• BGP sessions established
• Actively exchanging routes
• Carrying production traffic
This new interconnection delivers:
• International path diversity
• Network resilience
• Latency and performance to European destinations
• Overall redundancy for upstream and peering traffic
There is no customer impact associated with this change.
Traffic is being progressively optimized to take advantage of the new exchange capacity.
We will co...